The fleet · BUILDABLE
SDR-016 ·

NIGHTJAR

Buildable today on a ~£566 bill of materials with a 37-minute hover target, flying the CUSTOS autonomy stack on commercial hardware.

Render
AIRFRAME SPEC
NIGHTJAR
BUILDABLE
CLASS7-INCH SURVEY QUADCOPTER
STATUSBUILDABLE
MISSIONWILDFIRE EARLY WARNING
FIGURES
ALL-UP MASS1.33 kgTarget
WHEELBASE293 mm
ENDURANCE37 min hoverTarget
RANGE20 kmTarget
PAYLOADNot yet set
SENSORFPV camera on the current build · EO/IR thermal core planned · ASTRUM SPAD array (research)
LINKMAVLink v2 · PRAETOR link
LAUNCHVertical
THE MISSION
CIV-01

WILDFIRE EARLY WARNING

Dawn and dusk patrol lines over high-risk forestry, reading the ground in thermal. A smouldering ignition is geolocated and reported minutes after it starts, while it is still one crew rather than a thousand hectares. 2025 gave the UK its largest recorded wildfire. 2026 gave Scotland a national action plan.

PAYLOAD
EO/IR thermal core (planned) and ASTRUM SPAD array (research), with a calibration pipeline tuned for low-light edge inference across the dawn and dusk ignition window
PROFILE
Autonomous patrol lines · dawn/dusk cycles
OUTCOME
Target: under 90 s from ignition to alert on patrol
REGIONS
Scotland · Iberia · Gulf